Primary School - Somerset

A new primary school project in Somerset was designed with BIM ISO 19650 in operation through the early RIBA stages – RIBA stage 1 to 4 (Springfield went on to install using our fully trained team for fitters)  – with Client Engagement Meetings supported with drawings created in Revit – using 3D VR visualisation tools the client had the option to view in 3D long before the school was built. This resulted in many accurate decisions and specification choices to give the students the best possible environment.

Explore all our services and full product range by visiting our main site.